Aug 18, 20181 min readRoadwork in Trailsedge Phase 1Installation of the final lift of asphalt for the following streets to take place during the week of August 13th: Contour St., Butterfly Walk, Morningstar Way, De la Melodie St.
Installation of the final lift of asphalt for the following streets to take place during the week of August 13th: Contour St., Butterfly Walk, Morningstar Way, De la Melodie St.
Comments